Friday, October 17, 2008

End of week 3

So, as things are now, I have one more big truck load of stuff to go up to the new place. I still have a few big power tools to move, and I still have piles of smaller stuff that's on the way out. I figure this Thursday I'll rent another truck, and have another go at it. But this trip will be different from the first one. The first time, everything had casters, or mobile bases. This time, it's mostly boxes, chunks, bits and pieces, and a big stack of lumber.

BUT, I'm still pretty lazy, and I have one big advantage, working out of industrial spaces, that I wouldn't have if I was moving an apartment or a house... loading docks. The joy of these miracles is that I can rent a nice big box truck from Penske, and roll everything right onto the truck.

"But wait," you might say. "You said you didn't have casters on everything."

This is true, I don't. I have pallets, and a pallet jack. And I have to say, there's something fundamentally satisfying about loading up a pallet full of boxes. No, I don't yearn for days of yesteryear, working saturdays at the grocery store, and breaking down the weekly order. It's just that, I know that I won't have to lug any of these boxes anywhere. No lifting, no dragging, no schlepping, no stairs, no 2-man carries, no pizza party, no hassles. Pallet jack lifts the whole pallet up, I wheel the thing down the hall to the elevator, down to the truck we go, and roll it onto the truck. My only regret is that we don't have wider hallways and a second pallet jack so that we could have races. I still have to pack and unpack the boxes, but that's less of a hassle, I think.

-------------------------------------------

All that aside, the place is finally starting to look like a shop, which is nice. There's still a lot of work to be done, but all in due time.

Thursday, October 16, 2008

A few more pictures.

Things are slowly moving forward. The wall is up, machinery is slowly trickling in. Wiring is getting close to being done. We still need to build doors to finish separating the space. And after that... well, there are shelves to build, lumber racks, counter tops... there's still plenty to do in order to turn it into working, functional space that will accommodate and assist in productivity. I think it's going to turn into a longer project than the other guys had in mind... but one thing at a time.



























Friday, October 10, 2008

Fits and Starts and Harvey


The truth is, the new place has been moving forward in fits and starts. i think the original idea was first spawned sometime in July, and the lease didn't finally happen until this month.

For the past 2 weeks, we (Chris, Don, and I) have been building a dividing wall to separate the space into two areas, one will be the bench room, one will house the machines. The basic idea is that the noisy dusty stuff will happen in one room, and the quieter stuff will happen in the bench room, where we'll be free to breathe without dust masks on.

By "the past 2 weeks," I mean, a few days last week, and a few days this week. Chris and Don both live in the area, and they have had other things to do for the latter half of each week so far. So it took us basically a week and a half to get the wall put together. But it's up. Mostly... it still needs doors to fully separate the space.

One side note about the shop... there's a peregrine falcon that lives on the side of the mill building on the other side of the parking lot. For no apparent reason, I've decided his name should be Harvey. We heard about him from Jimmy, who takes care of the building maintenance, and is also doing our electrical work. He said that he found the next on the other building.

Jimmy also had a recent story that happened in our space shortly after we started negotiating with the building management. He was working with his assistant, and the pigeon was perched up near the ceiling on something. Jimmy told his assistant to watch, as he poked a stick at the bird. Jimmy said that if the bird got onto the stick, that would mean that he's tame. Well, sure enough, the bird was tame, and had a band around his ankle, and Jimmy's pretty sure it was a homing pigeon. So, he took the bird in hand, walked over to the window, and let it go. Around this time, he realized "Oh, shit... the falcon!" He's pretty sure that's why the pigeon decided to hide indoors in the first place.

We have no idea if the pigeon actually made it home or not. But it's a pretty cool story.

Friday, October 3, 2008

Clean slate

So, the shop is moving to a new, undisclosed location. Tufts University owned the last place I was working in, and they've decided that it's going to be turned into a shiny new lab space for their sciencey people. They're not sure when, but they now have the money to make this plan a reality.

Well, it might be a while until they get the whole plan together. But I'm not going to wait around until they do and be the last guy in line at the loading dock.

So, as of Oct 1 the lease started on the new place. Of the space you can see, we're renting about half. If you look at the green and white pillars that break up the windows, our space goes down two more pillars from the left side of the picture. Altogether, it'll be about 3500 sq ft.

The shop will solve a few problems I've been dealing with lately:

-Loneliness. My first shop was pretty good, as first shops went. But it was specifically designated as a one-man space. When I was going to school for woodworking, we had 40 woodworkers on the same floor, every day. Lots of people to talk to, harass, and listen to. That, and I was still working at a woodworking retail store, so I had co-workers to spend time with, and customers to mistreat. It was great. But leaving the store and starting up my own shop, I went from all that, to nothing... just me. It took me a while to figure out how much of a problem that would be, psychologically... and what a potential problem it could have been, safety wise. I'll be moving into the new shop and sharing it with two classmates from school who are good friends of mine. It's not the same as interacting with a school full of people, but it's better than yelling at the walls.

-I needed a little more space to work in. My first shop was around 8-900 sq feet, for just me, and it was functional, but a little cramped after a while. Part of that had to do with the fact that the layout wasn't everything I could have hoped for. Over the course of my first year, I've learned a lot about what I like and don't like in a shop, and how the layout of the shop can work with, or work against, the way I like to do my woodwork.

-Layout! I'll get the chance to do this all over again, knowing now what I didn't know then. There's a proper work flow that my old shop lacked. Basically, there were times when I'd spend half of my time walking from one side of the shop to another, like a bumblebee. And I'd rather be spending my time working, instead of bumbling around. Of course, with almost 4 times as much space to bumble in, the shop layout had better be good.

-Separation of machines and bench space. Machines are great for the quick and dirty stuff, but they make a lot of noise and raise a lot of dust. In my own space, there really wasn't room, or need, to divide up the space. But that meant that I was walking around in the cloud of dust created by whatever machine I'd been working with, even when I was finally working at the bench. Now I'll be able to step out of the dusty area. And with 2 other guys, the wall will provide a nice sound barrier, so I won't have to listen to screaming machines while I'm doing (bang, bang, bang) quieter work at the bench.

-A commute will probably do more good than harm. I found out the hard way that working very close to home was a problem. At first, I'd go home during lunch, and end up wasting a lot of time. Later on, I'd get caught up in something at home sometimes, and it was easier to do that, knowing that work was only 5 minutes away. "I'll just get this done and go to work. It's not like it'll take me any time to get there... " Live and learn. The new space isn't quite so close.

So, stay tuned, I'm sure there'll be more news on a regular basis.

Sunday, April 13, 2008

The good, the bad, the ugly

Good news: This week I'll be wrapping up a commission, 2 tables for the woman who received the letter I posted a couple of months ago.

Bad news: It took a little longer than I thought, but that's ok.

Good news: Tufts University received a huge amount of money from one of their donors. I love my Alma Mater, and it's great that they have such generous contributors.

Bad news: The new research lab that Tufts has planned will be built in the building that my shop is currently located, so I'll have to find a new shop at some point

Ugly: It's not really clear when this is going to happen, and news has not been forthcoming. People in the building have known for some time now that something was coming along, because the leases that they've been offered have been getting shorter and shorter, without much in the way of explanation. The news about the labs to be built was posted on the Tufts website, and they say they'll have an architect in the next 2 months. But there are people who have already seen drawings for the proposed labs. It's all rumor at this point, and noone really knows anything. My lease runs through next summer, so in theory this won't affect me for a while. But it's still something to have to worry until we all know whether or not Tufts is going to let us stay that long, or if they're planning to buy out our current lease contracts. I'd like to be able to plan the future, but at present I don't have a way to do so. I just know that things will change in the near future.

Sunday, March 30, 2008

Bit by incremental bit.

This week the shop has been quiet, as I've taken time to attend to other issues, like getting ready to take new pictures of the work I've done, recovering from vacation, and re-working some of my organizational techniques. Not a very exciting week in the shop I'm afraid. The only wood related project that came to completion involved putting a new handle on a chisel. It made me happy, but it's not exactly earth shaking in its implications.

On the other hand, I did receive a deposit on the commission for the woman who received the letter outlined in an earlier entry. Two tables, due in about 3 weeks.

Lastly, I finally found time to attend to some of the mess in my basement, which is going to be the backdrop for all of the work I'll be doing for a book I'd like two write. The downside... I'm probably moving out in a few months, so I'll have to get a new basement cleared and set up for work. But still, Im not going to complain. Progress is progress, no matter how small.

3/30/8 JW

Sunday, March 23, 2008

3/23/08

It's been an interesting month. Not very good for blogging, clearly.

The desk is still in process, derailed by other projects. I'll have it done in 2 weeks.

No, really.

In the meantime, I've been up to the following:

-In preparation for a class, I decided to design a pair of portable router tables. The class is very heavy on the router table work, and it's just easier to have a few extras for different steps, and leave them set up for the day. The designs worked out well, and the tables performed very well in the class. In addition, they were less expensive than most others, since I was able to get two complete tables out of one solitary sheet of plywood, and add in a few design features that I found to be useful. I'm pretty happy about those.

-I taught a class on building a frame and panel blanket chest. In essence, it was a kit class, the students didn't really build their chests from scratch. I milled up the lumber, and cut the parts for the kit. They got to run molding with the above mentioned router tables, cut joinery, drill holes, and see how it all goes together. We glued everything up, and did a few other things, and they got to go home with fully assembled pieces, that still needed scraping and sanding and finishing. Not bad for a weekend class.

I got a bit of a hard time from one of my friends at the store, who says I should charge more for lumber, and for my time in processing and milling everything up. He has a point, but I think I have a better one. I told him that for me, this was actually serving as boss training. Some classes are basic woodworking fundamentals courses, and they're great for the people who are taking the course. In this case, I got to try my hand at getting two guys with very little experience to actually build a fully assembled piece in two six-hour days. In a production shop environment, I'd need to be able to design pieces that could be built by my employees successfully, in a fairly small amount of time. I think I managed to do that in the class. So, everybody wins. The store (ideally) makes money, and keeps their customers happy. The students learn, and get to bring home a nice piece of almost-done furniture. I get to learn more about teaching people, about designing furniture, and I get paid to do so. Not too shabby.

-I built a similar frame and panel chest for my girlfriend, Ariel.

As I may have said, one o the joys of production work is that it doesn't take too much longer to push more wood through the machines, once everything's been set up. This was no exception. I knew in advance that her birthday was coming up, so when I was milling up wood, I milled up some extra, with a few modifications. The most obvious change is that her chest is five feet long. There were a few other minor modifications, but there's also a great story.

I routed out big recesses to hold lid cleats inside the lid, to help keep it flat. This went more or less ok, but I had to do some fussy fitting to get the cleats in place. Eventually everything is drilled, and screwed into place, and I fit the lid to the top of the chest, and surprise, the lid is too big. Board is too wide, need to rip it down to a new width. That's fine, I think, because part of the edge molding that was done was a bit wonky, so I'll rip off of the front edge, and spin it around, everything will be cool.

Notes on terminology for non-woodworkers: Board width is measured across the grain. This can be confusing in a story like this, because the length of the board is oriented with the width of the chest. The chest is five feet wide. The board is 5 (plus) feet long, but 15 inches wide. Because the board was too wide, it was sticking way out in front, and had an overhang of something like 3 inches or more. So it needed to be ripped down: Ripping is woodworker-talk for cutting a board in the direction of the grain to remove some width from the board... or rip into two boards. Back to the story...

After ripping the board to final with, I noticed that the cleats, which I'd inset into the board, were evenly spaced, but the layout was offset. The one on the let was 2 iches farther in from teh end than the one on the right.

Hm. That sucks. What the hell am I going to do now?

Author's note: There's a simple fact to bear in mind when reading stories like this about work that has gone awry. Pretty much every woodworker's tool chest is equipped with a selection of well used, and well honed vocabulary that we instinctively pull out in times of need. And while this was clearly one of those times, these words failed, as always, to actually repair the damage that had been done. (Despite a virulent effort on my part.)

I pondered, and pondered. As I thought about this, I ran a new molding along the new front edge of the chest. I fit the lid to the box again, and the lid cleats, which had fit so well before, are now hitting the front of the carcase, because the lid is spun around. Turns out I ran the molding along what used to be the back edge, so the lid cleats, which had been perfectly spaced from the back, were now spaced from the front. Well, crap. I shifted it back, because, I just want this thing done. Fine. The lid is a bit farther back than I wanted, but it works.

The only thing I could come up with to help the offset cleats is to use the larger space on one side for something decorative. I was already late on this present, the lid is not going to plan, and really, the only thing I can think of to make light of all of this is to go for sappy points, and carve a big heart with our initials in it. Yes, I lose dignity and manly points for doing so, but I'm hoping that it will make up for the goof with the cleats, and the fact that this thing is, by this point, a week late if it's a birthday present. I take the lid off of the chest, and lay it down to do the carving. I do a quick heart and initials pencil line to follow, grab a carving tool and a wooden mallet, and go to work.

10 minutes later, it's 9PM, the initials and heart are done. The lidless chest is oiled and ready to go, all that's really slowing me down is the lid, which I can now oil and throw on the chest, and have done with it.

Wouldn't you know it? The lid was off the box, and I didn't check the orientation. After all the hassles fitting the cleats into the mortises, ripping the molded lid, and running a new profile, and all the other hassles, I carved the heart, and the initials, upside down.

SO, I had to make a new lid.

That was a week ago. Last week I spent cleaning up the shop, and getting ready to go back to work. I went on vacation on Thursday, and while I tried to make the first half of the week as productive as possible, it really didn't work out that way. The shop is clean, and as a reward for myself, I took half an hour to make a very pretty scrap of figured wood into a handle for a chisel.

This week I'm going to spend some time marketing and trying to shake out some work, and next week I'll get back to the desk. I'm also going to try to schedule blogging as one of my weekly (or more frequent) activities.

Happy Sunday, folks.